Sunday, August 31, 2008

Project 2 : Presentation -Kartina's part

Designing the masterplan layout for presentation

We have divided the tasks equally amongst group members.

We have decided to retain the building layout but have decided to make the road (adjoining to the fire station) a bit wider so the traffic flow would be smoother.

We have also decided to place the admin at the area opposite of the admin area. But we were a bit skeptical about that because the nursing home is just at the back of the school.


This is my poster for project 2's presentation.This poster is about the site analysis of the torquay college.


Saturday, August 30, 2008

Preparing for Presentation Site Analysis -4/9

I was given the task to present the site analysis to the reviewers on 4/9.

So here are the key aspects that i would present to the reviewers.

SOIL CONDITIONS

The soil conditions around Torquay College area is slightly muddy but is surrounded with indigenous plants and shrubs.

SITE TOPOGRAPHY


The site topography as you can see from this area is not a flat surface but has a slope (a bit hilly) in this area

PLANTS & VEGETATION

Indigenous plants and vegetation are planted around the site area

SITE ACCESS AND EXITS

With access and exits ,snce we are concentrating on this particular site for our site changes,we found out that there is also a path that leads to the nursing home, the depot area (which is under construction at the moment) as well as the main exits for the council's use).

EXAMINATION OF ROAD MANAGEMENT
The road management in this area can be concluded as heavy during peak hours at 8-9am and after school hours (after 3pm) at the main road

SERVICES AND LOCATION
With the services and location, there are proper drainage system connecting from the fire station area to the depot area, as well as a communication tower close to the fire station.

Friday, August 29, 2008

Site Visit #1 : Picture taking and site analysis






For our second project, we were asked to investigate the site of the Surfcoast Shire Council offices (Torquay Junior College) in order to fulfill project 2’s task.(which is to build a sustainable school for 400-500 senior school students)

Here are some pictures that we took

And here are our findings from the site visit.

-there is a pathway that leads to the lion’s village

-theres a nursing home close to the site area

-there is also a fire station that is close to the building (which we have to take into account especially when designing the traffic system for the school)

-there is also a road that leads to a private land ( not too sure whether to use that area and combine it with the given site area—may take up too much space?)

-wind are from south(strong at midday)

-updated** : we had our 2nd visit to the site area

-here are our new findings

-the wind direction does not only come from the south but it is also directed from the west

-local plants are planted along this area and we have decided to plant more of these shrubs for our new site.

More pictures:

Monday, August 25, 2008

Our final project Video!

Model Making Progress

We had finalised our design for the project.What we are doing right now is to draw up the building frames in CAD,get it cut by the laser cutter and start building the model!

Here are the pictures!

Saturday, August 23, 2008

Animation






This is how we build our building frame. Its modular and simple and its adaptable(meaning more mod5 classrooms can be added)

Monday, August 11, 2008

Building Orientation (Links and more)


This is a great website to visualize sun shading from proposed building or to investigate whether the building will get sufficient access to the sun or otherwise.

The thing with mod5 building is, according to this other website ,
is that you can maximize or minimize the sun access, or utilize the heat,lighting according to the orientation of your mod5 building.You can move it anywhere u want since it should be portable.

Since we have decided to place our mod5 building in Victoria,particularly in Geelong, ive decided to screenshot the average climate in Geelong. Taken from this website


Saturday, August 9, 2008

An update on Screwpile Foundations

I just found an interesting website showing a detailed step by step screwpile connection to the grounds.

Some interesting bits that i picked up from the website




Screw pile connection to floor framing
(timber members)


Detail of screw pile connection to (steel) floor beam Unit 2 with underground storm and sewer connection in place and capped visible just above ground level


(Click on the following link for more info! www.archicentre.com.au/treehouses/photogalleryNov2004.htm)

Week 3: Things to do for Week 4

Things to discuss this week with group members!

  • Decide which area the mod5 will be allocated
  • Research on climate and soil conditions, sun orientation

Screwpile Foundations

We have divided work among group members and I was given the task to do more research on screw pile foundations.

As suggested by Mark, we have finally agreed to pick Screwpile as our foundation system.

Now, what is screwpile?

(image taken from www.pilingsystems.com.au/what_is.shtml)



Screwpiling , according to www.instant.com.au is a process where circular hollow section of steel (shaft) with one or more tapered steel plates (welded to the shaft)are screwed to the ground.It is cheap, simple and is suitable for unstable soil grounds ( perfect for mod5 buildings!).

(image taken from www.pilingsystems.com.au/what_is.shtml)

Connections to footings


The connection of screwpile with the footings is done using Y bars placed through the top of pile or e-flanges.

The advantages of Screwpiles (according to www.instant.com.au)
  • Vibration free installation (no interference to adjacent buildings/structures)
  • Very fast installation (actual pile installation average of approx. 5 minutes
  • Minimal noise disturbance to adjacent environments
  • No de-watering
  • No concrete
  • No Reinforcement
  • No spoils
  • No liners
  • Versatile
  • Re-Usable
  • Problem Sites Solved
  • The Environmental Choice



More images on connection of the screwpile to the ground(taken from www.instant.com.au)

Week 3: Summary and Design Process

Our group has decided to stick with the design/outcome of the first esquisse.

We had problems developing the design, but were very happy to receive feedbacks from our tutors!

Our first tutor, Lana,was impressed with the design of our mod5 building. However, according to Lana the main issue with the design is the shape of the random triangulars on our roof. She suggested that we use an equal sided triangle to emphasize the repetition element in our design. Here are the key points of what has been said and suggested by Lana:

- the use of circular posts, bio domes

- research on Shigeru Ban

- Lighting -> what makes a good learning environment for kids

- Furniture,arrangement of spaces

- Floor system and connections of panels

- Main ridges ; slot panels


Then we were lucky enough to get advice from Mark Luther.

He has helped a lot especially with the ventilation and the orientation of the building, and how we can make the best of our roof design.

Here is what has been suggested by Mark.

-Roof structure; Mirror shapes to get the random effect

- Orientation

-Bed zed

-Ventilation, little flaps opening on the structure

- research on Frank Lloyd Wright’s designs

-Right angled platforms

-put visible panels (on north and south)

-water tanks to be put under the building

-floor plan (take a look at services and hydraulic)

-foundation – screw pile foundations

-air heat exchanger

-hydraulic heating

Friday, August 8, 2008

More on portable architecture

The first assignment requires students to include "the portable element" into their designs.

Nil Holger's Walden



This is an awesome design, i've always wanted to make this type of portable space. This genius guy called Nils, created a shed to put tools called Walden. He creates slots for the space and as you can see,this is a creative design.It has a sunscreen and a place for people to sit and enjoy the view.I am not sure this design is fully portable but it looks like it.
Click here to know more about this exclusive design.



Adam Kalkin's Illy



Meet Illy, the push button house. Design Adam Kalkin, invented this house within a shipping container. Now thats creative. At the push of a button, it transform to a five bedroom,a single kitchen,dining room,living and a library!

Wednesday, August 6, 2008

Youtube links

I had a video bar on the side of this site,unfortunately due to the change of layout, it has been disabled. Worry not, here are the videos from the video side bar !




This is a video on modular buildings (installation)







Monday, August 4, 2008

Week 2: Design Process

I have tried to develop the design from the outcome of our esquisse and here it is!

Ive got lots to do!!!!! So much to do,so little time!!!

Sunday, August 3, 2008

Useful links for SRD364 students