Monday, October 27, 2008

Final poster

Thursday, October 23, 2008

Final poster : Technology Centre



Final Poster: Sports Centre - Plans


Thursday, October 16, 2008

Sports Centre: Details fully explained


  • The centre is 40m long and 32m wide.
  • It houses sports facilities such as gym, two basketball courts and a multipurpose room for yoga and dancing activities.
  • As you can see ive placed the windows at the front and the back and not the top. It will get too hot for people to be playing sports in the centre.
  • Ive also placed 3 seating areas. The areas below,is used for storage and changing room.
  • Rock climbing is placed (as you can see below).
  • The materials used for this building is recycled steel and double glazed glass.

Wednesday, October 15, 2008

Pictures Galore: Sports centre





Ilya built this in a day!!

Monday, October 13, 2008

Technology Centre: Details fully explained...


  • The centre houses 3 study areas which are woodwork,home economics and science labs
  • The concept is derived from the wind characteristics.Like how it travels from south;west
  • The triangular outer design timber shapes is designed to create a modern look
  • On GF, home eco,woodword studies and cafe are placed hear.
  • The semicircular area is the green house area. Double glazed glass is put in ,in order to protect the humidity of the building but at the same time allows sunlight to go in
  • The Greenhouse area has hidrophonic plants on FF.
  • At the central,it could be hot,so an atrium is created to let more air in.As well as louvres.
  • During winter,the area can be closed so that the cold wind will not affect as much as during summer

Sunday, October 12, 2008

Pictures Galore: My technolgy centre model!

It took my 3 whole days to make this model!Ive used foamboard,balsawood (3mm,5mm) for the materials.

Thursday, October 2, 2008

Sports Centre design updated!

There is also rock climbing included-at the west entry!Just to save space!!

Final elevation for Technology Centre

Tuesday, September 30, 2008

Sports Centre Design Update



Initial designs ( straight to AUTOCAD! hehe)

Measurements :approx 40 m long and 32 m wide

Monday, September 29, 2008

Site Model Drawing

Ilya,Joey and I have been working on the site model. We have decided to place the buildings according to what is relevant- walking distance wise .Have a look at the car port,and bus drop offs. It is close to the adminstration area,and we have decided to close the area accros the admin ( refer to project 2 presentation).We thought it was a bit dangerous for kids to cross roads that are busy with vehichles at after school hours.
My TC and sports centre is placed at the most suitable place. The sports area is close to the primary school area and the technology centre is placed close to the loading area ,so that whenever theres any loading whether it be food packaging or wood for woodwork,its much easier with the loading area close to the tech centre.

Sunday, September 28, 2008

Technolgy Centre Update

My new design! NOW--Look at how ive changed the layout of the science labs.Now it looks better. Plus ive decided to delete the area where it has such confined space (at east ground floor).
Yay!

Saturday, September 27, 2008

Technology Centre update!

My revised Technology plan!!

I think i have changed alot of the design -plans wise. Like,look at how ive changed the green house area. And the science labs.But ive got a feedback from this today-- its still rigid looking :(
So im going to change the first floor layout-- I am quite happy with my ground floor layout,so im not going to change it.Except i will make the placement of chairs and tables more random.I dont want it to look too rigid.

Thursday, September 25, 2008

Links!

Ive used this link to do a research on high schools in Australia.
Melrose High School is a great example.

Ive used their study units as an example on what to include for the Ground Floor area.

I also did a research on wikipedia on schools around australia and what their schools offer.

Wednesday, September 24, 2008

Sports Centre Design Update!

Today would be my last day to decide whether or not to make the sports centre public.I think i will choose to make it not public.And here is my reason: i dont think its a good idea.So im keeping it school friendly only.

So now, i would try and divide the sports centre into a few areas.

1.Admin
2.Basketball courts - 2 of them
3.Multipurpose room
4.Changing room
5.Seating area
6.Storeroom
7.Cafe? maybe



Here are some important measurements for the sports center(Basketball court)taken from ( http://content.answers.com/main/content/wp/en/thumb/5/57/300px-Basketball_court_dimensions.png)

Tuesday, September 23, 2008

Sports Centre Update : Like finally!

Okay,seriously ive been neglecting my sports centre. I mean im still not sure whether or not to build something for the public to use. I think i need to talk to my tutor about that. Meanwhile,i will try and remember what the principal ,Pam ,has said about sports centre in the lecture.

1.To combine 2 basketball courts (for junior students and senior students)-- that means,sports centre has to be close to the junior school
2.no swimming pool,well..its not encouraged.
3.she likes someething that could make the public to use the school area...so maybe a public sports centre is a good idea? (still not keen on the idea where people would be wandering around the school)
---------------------

Heres a video for you to watch !




Cool links!

Sustainable + Design links for you people!!!

Green Design - Anything green design related links
Green Building Basics- What you need to know when building a green building!

------------------------------------
I think i need to research more on study areas and science labs.

Monday, September 22, 2008

My attempt at designing the first floor plans!

Okay,basically,ive decided to include all the woodwork,home economics study area,sewing class,cafe ( well in the brief it was stated that CAFE MUST BE ADJACENT to the home economics area)on GF.And science labs upstairs.

I think its too plain.

I have also included outdoor cafe--just so students can enjoy the sun,and the environment and pretty gardens surrounding the school.


----------------------------------
Update!!
We were told to change our masterplan a little bit.Like do a sheltered pathway so students wont get wet or wont get too much exposure from the sun.And a courtyard for students to use.
Love the new masterplan.Now,back to work!!(tempted to watch tv!)

Sunday, September 21, 2008

Technology Centre Update:Greenhouse

I have decided to include a greenhouse in my technology centre. Since we will be concentrating fully on the subject - Sustainability, i have chosen to include a greenhouse in the centre of the building--in both floors.

So to further my understanding in this subject, i did a thorough research on GH.

Here is an extract of Greenhouse from wikipedia(pic courtesy of wikipedia)

A greenhouse is a structure with a glass or plastic roof and frequently glass or plastic walls; it heats up because incoming solar radiation from the sun warms plants, soil, and other things inside the building. Air warmed by the heat from hot interior surfaces is retained in the building by the roof and wall. These structures range in size from small sheds to very large buildings.

So basically,incoming sun heat will be retained in the building,but will it make the building temperature higher? i guess it will be cooled down with the existence of plant and the design of the roof--bringing cool wind from outer area to the inner area (through louvres and atrium).

So to include a greenhouse,i need to take a few things into consideration:
1) since level 1 will have GH ,ive decided to just put hydrophonic plants.
2) glazed glass and overhangs at area that has too much sunlight.

Saturday, September 20, 2008

Technology Centre Update: Early design stages


I have decided to do the elevation first .I really liked the idea of a curvy roof, and i shall keep everything else simple then! The blue posts on the exterior of the building are timber posts...Just to give the building a little bit more character.Why the overlapping X timber posts? I guess, thats just my style!
The idea of the roof is to make sure that when the building gets too hot,it can be "cooled" down with the wind direction moving from the south-west.
I think i would put an atrium at the middle.
Will write more!

Update on Technology Centre

Cant remember where i copied this.Great information,tho.

Couldnt help but wonder if im concentrating too much on TC?

Friday, September 19, 2008

Technology Centre Update


I like this roof.How about you?

Thursday, September 18, 2008

Designing Sports Center

I was asked to share a building with ilya,so i have decided to design the layout,plan-design and whatever else that needs to be designed.
I am not sure whether to build a sports centre for the public, or just build a sports center for the school students to use. I think for now,ill choose the former.

Here is my initial designs!

Sports Centre Design

I was told i could either build a stadium or a sports centre for the public to use,or build a sports centre for the students to use.
Pros & Cons
Stadium for public:
-Would cause traffic congestion around the school area whenever there is a sports event
-Will probably use more $
-Will have to think about parking lots and security
- Will encourage the community to use that area and will attract people to the area
-Advantage for school students- they have a wider range of facilities for them to use

Wednesday, September 17, 2008

Technology Centre Size Approximation


(click to enlarge,of course)


Here is my attempt at mind mapping-- for the technology centre. I guess this is a better way to know what to include in the building. I have decided to include the science labs in this building as well.Maybe,computer labs--maybe if fits.Not too sure how many is needed,and how much area is needed.Approximately 600 metre square (or maybe twice of that)...Need to try and make use of Mark Luther's theory..

*note to self: dont forget facilities for the disabled--lifts ,ramps,toilets.

Another architortural attack!!!

OH MY! I WAS ASKED TO DESIGN ANOTHER BUILDING ! SPORTS CENTRE!

Tuesday, September 16, 2008

Feedback from Jeremy

Here is feedback given from Jeremy

  • movement,landscape,sheltered,protection and social activity area should be provided.
  • avoid building being rectangular,no angle (like 45') in buildings
  • no thin connection
  • we have a great path line
  • no need to have a big monolithic building
  • should have a welcoming entry ?
  • second storey,put a smalled building connecting to the main building; footbridge
  • think about the pathway

Sunday, September 14, 2008

Project 3 :Progress - Designing the Technology Centre



I liked the idea of having a "wavy,curvaceous" roof. If i keep my plan rigid and simple,i would definitely like to make my roof with a little bit more character. I think since Torquay is well known for its surfing beach and how surfing interrelates with wind, i think Torquay's wind characteristics would be my design concept for Technology centre. What do you think?

Saturday, September 13, 2008

Project 3: Initial sketches for given building(s)



Here are my initial sketches. I was given the task to design the technology centre. I am still not happy with my design at the moment.:((

Friday, September 12, 2008

Site Analysis for Project 3 (Revised): Changes and progress

Here is my take on the site analysis. We were asked to each design our masterplan and then discuss the pros n cons of each design and take the best of each design and combine it together. I have decided to change the carport area and bus drop offs ,and create a better pathway for students to walk around the school.

Sunday, September 7, 2008

Project 3 : Developing the Masterplan

The changes:

We have decided to replace the Surf Coastal Shire's building to the senior school’s admin area. During tutorial,Jeremy has told us not to retain the buildings shape.Unfortunately not many people liked the idea of the half pentagon shape ,so we have decided to build a new administration building, and demolish the old building.

We have also decided to change the port for drop offs ,as well as the traffic layout of our new site.Looking at the placement of the fire station, we have also decided to try and solve the problem if there were to be a traffic congestion in between the fire station road and the one connecting to the main road.

We have also decided to make full use of the path leading to the lion’s village.

So this is one of the earlier versions of the changes that we have made..

Saturday, September 6, 2008

Feedback 4/9 presentation

Feedback from reviewers

-The project brief is not refined enough
-include a sketchup model
-factual data is missing
-fluid mapping is missing
-massing model?
-be careful when putting carparks around the school
-be careful when using the same shape for the admin bldg because apparently everyone hates the surf coastal shire bldgs design
-good idea on sports facilities
-should worry about the planning control of the traffic
-site analysis ->more detailed
-no hierarchy shown
-good schematic zoning
-more area analysis
-carparks should be out of institution

Sunday, August 31, 2008

Project 2 : Presentation -Kartina's part

Designing the masterplan layout for presentation

We have divided the tasks equally amongst group members.

We have decided to retain the building layout but have decided to make the road (adjoining to the fire station) a bit wider so the traffic flow would be smoother.

We have also decided to place the admin at the area opposite of the admin area. But we were a bit skeptical about that because the nursing home is just at the back of the school.


This is my poster for project 2's presentation.This poster is about the site analysis of the torquay college.


Saturday, August 30, 2008

Preparing for Presentation Site Analysis -4/9

I was given the task to present the site analysis to the reviewers on 4/9.

So here are the key aspects that i would present to the reviewers.

SOIL CONDITIONS

The soil conditions around Torquay College area is slightly muddy but is surrounded with indigenous plants and shrubs.

SITE TOPOGRAPHY


The site topography as you can see from this area is not a flat surface but has a slope (a bit hilly) in this area

PLANTS & VEGETATION

Indigenous plants and vegetation are planted around the site area

SITE ACCESS AND EXITS

With access and exits ,snce we are concentrating on this particular site for our site changes,we found out that there is also a path that leads to the nursing home, the depot area (which is under construction at the moment) as well as the main exits for the council's use).

EXAMINATION OF ROAD MANAGEMENT
The road management in this area can be concluded as heavy during peak hours at 8-9am and after school hours (after 3pm) at the main road

SERVICES AND LOCATION
With the services and location, there are proper drainage system connecting from the fire station area to the depot area, as well as a communication tower close to the fire station.

Friday, August 29, 2008

Site Visit #1 : Picture taking and site analysis






For our second project, we were asked to investigate the site of the Surfcoast Shire Council offices (Torquay Junior College) in order to fulfill project 2’s task.(which is to build a sustainable school for 400-500 senior school students)

Here are some pictures that we took

And here are our findings from the site visit.

-there is a pathway that leads to the lion’s village

-theres a nursing home close to the site area

-there is also a fire station that is close to the building (which we have to take into account especially when designing the traffic system for the school)

-there is also a road that leads to a private land ( not too sure whether to use that area and combine it with the given site area—may take up too much space?)

-wind are from south(strong at midday)

-updated** : we had our 2nd visit to the site area

-here are our new findings

-the wind direction does not only come from the south but it is also directed from the west

-local plants are planted along this area and we have decided to plant more of these shrubs for our new site.

More pictures: